Community Bonding Period Update 
The community bonding period wraps up today and coding starts tomorrow, so here’s a quick look back at what these past few weeks looked like.
Dev environment setup
Got the module building and running locally on Windows + WSL2 + Docker with the O3 distro. Now I can build, deploy, and test PDF generation end-to-end!
About the very first PR of this project…
The architecture took shape through review. I raised my proof-of-concept as a draft PR early in the bonding period. It’s been through several rounds of review and the architecture evolved a lot through those discussions — the renderer went from hardcoding all section calls by name to a properly pluggable SPI where each section owns its own XML rendering. Along the way I also learned about using concept maps over hardcoded UUIDs, making clinical data lists extensible so different deployments can customize what shows up without touching code, and following existing module conventions for config keys. The PR is now out of draft and ready for review.
My biggest takeaway…?
Honestly, the most valuable learning came from the review discussions. One thing that really stuck with me was around error handling, I initially thought silently skipping a section when data fetching fails was graceful handling. But from a clinical perspective, there’s a huge difference between “this patient has no allergies” and “we couldn’t fetch the allergy data.” A clinician reading the PDF might assume it’s safe to prescribe something the patient is actually allergic to. That changed how I think about edge cases in healthcare software — every design decision carries real responsibility.
A note to my mentors![]()
A huge thank you to @wikumc and @nethmi for being incredibly patient and supportive throughout the bonding period. The reviews and discussions pushed me to think deeper, not just about making code work, but about why design decisions matter when the software is used in clinical settings. I’ve learned more in these few weeks than I expected, and I’m going to do my best to make this project something the community can genuinely use.
Now what’s next…?
Week 1 (May 25 – Jun 1): Addressing the remaining review feedback on the PR and working towards getting the first minimal working PDF merged — patient info + vitals with the full pipeline working end-to-end.
Excited to get building! ![]()