hi
with an aim to scope down the feature and get a
- quickly deployable
- Unique
- Exciting feature
This feature I suppose from discussions , it will be foundational/fundamental for other orgs to pick up and enhance given the 3 months timeline i have. So my aim now is to fundamentally put in all to implement three main functional features;
- Template loading
- Gallery of diagrams/images
- Attachment to form entry
So this will be the project task list;
Any suggestions on improvement are welcome(thoughts about the break down)
Week | Tasks | Deliverables |
---|---|---|
1 | Requirement gathering and analysis | Finalized requirements and prioritized feature list |
Design and architecture | System architecture design and data model | |
Backend development | Initial backend implementation | |
2 | Backend development | Completed backend APIs and services |
Frontend development | Initial frontend interface | |
3 | Frontend development | Refined frontend interface |
Integration and testing | Integration with OpenMRS O3 and Attachment module | |
4 | Integration and testing | Thoroughly tested and bug-fixed application |
Refinement and documentation | Updated documentation and user guides | |
5 | Refinement and documentation | Finalized documentation and addressed usability feedback |
Deployment and demo | Prepared application for deployment to OpenMRS demo | |
6 | Deployment and demo | Functional MVP deployed on OpenMRS demo |
Stakeholder feedback and feature prioritization | Prioritized feature list based on feedback | |
7 | Backend development | Implemented regionalized wound data(i suppose this is specific to @icrc) ()functionality |
Frontend development | Implemented diagram annotation and image attachment | |
8 | Backend development | Completed template configuration and upload functionality |
Frontend development | Implemented gallery for template loading | |
9 | Integration and testing | Tested integration with Form Builder module |
Refinement and bug fixing | Addressed bugs and performance issues | |
10 | Refinement and bug fixing | Refined user interface based on feedback |
Documentation and finalization | Completed documentation and user guides | |
11 | Deployment and demo | Conducted final testing and bug fixing |
Stakeholder presentation and feedback collection | Gathered feedback on MVP and future enhancements | |
12 | Final refinement and bug fixing | Addressed any remaining issues and polished the solution |
Final documentation and project conclusion | Completed documentation and concluded the project |
Just to get me started with week 1 task;
How does the existing OpenMRS data model align with the requirements of the wound data regionalization, annotation, and image attachment features?
I want ensure that my implementation aligns with the OpenMRS data model and allows for smooth integration and interoperability within the OpenMRS ecosystem.
I need guidance here
@ibacher @burke @mksd @michaelbontyes @heshan @jayasanka @jesplana @dkayiwa